SABA体育

Saba体育 - 您的专属电较量事主场
Saba体育 - 您的专属电较量事主场 Saba体育 - 您的专属电较量事主场

CLIMAVENETA

会员1
Saba体育 - 您的专属电较量事主场
Projects APPLICATION
? Location:Home>Projects
CLIMAVENETA

CICC technology research and development base

Area:Shanghai? System Type: Construction Area: Application Type:Office Buildings Cooling Capacity:9012kW Heating Capacity:

Project:

CiCC Technology R&D Base project adoptsWater cooled chillers with a total cooling load of 9012kW, and the project mainly uses the cooling load area as a data room

Installed Units:

6 x ERACS4252C-B

Solution:

CICC technology research and development base project using Water cooled chillers, the total cooling load of 9012kW, the project mainly uses the cooling load area for the data room, due to the large heat dissipation of the computer room, the need for year-round cooling, to ensure that the temperature of the data room is appropriate.

Certification:

版权-表套
Saba体育 - 您的专属电较量事主场

Projects

APPLICATION Saba体育 - 您的专属电较量事主场
Projects Saba体育 - 您的专属电较量事主场
Saba体育 - 您的专属电较量事主场

CICC technology research and development base

Area:Shanghai? System Type: Construction Area: Application Type:Office Buildings Cooling Capacity:9012kW Heating Capacity:

Project:

CiCC Technology R&D Base project adoptsWater cooled chillers with a total cooling load of 9012kW, and the project mainly uses the cooling load area as a data room

System Type:

Installed Units:

6 x ERACS4252C-B

Solution:

CICC technology research and development base project using Water cooled chillers, the total cooling load of 9012kW, the project mainly uses the cooling load area for the data room, due to the large heat dissipation of the computer room, the need for year-round cooling, to ensure that the temperature of the data room is appropriate.

Certification:

【网站地图】